Wellington’s Engineers: Military Engineering on the Peninsular War 1808-1814

Wellington’s Engineers: Military Engineering on the Peninsular War 1808-1814 Read Online Free PDF

Book: Wellington’s Engineers: Military Engineering on the Peninsular War 1808-1814 Read Online Free PDF
Author: Mark S. Thomson
Tags: History, Military, Portugal, Non-Fiction, Spain, Napoleonic wars, Engineering
different seasons of the year. Several bridges built by the Romans still stood proud, such as those at Almaraz, Alcantara and Salamanca. Every campaign during the war relied to some extent on controlling, constructing or destroying bridges.
    One of the Allies’ first tasks in 1808 was to establish crossing-points on the river Tagus in Portugal to allow rapid movement between the north and south of the country. Initially this was achieved through floating bridges (ferries) but later they were replaced by pontoon bridges. The boat bridges at Abrantes, Punhete and Villa Velha remained key crossing-points in all operations for the remainder of the war. These were carefully guarded and taken down whenever there was a threat from the enemy. Keeping these in place required constant attention and maintenance, as they were large structures. Lieutenant Harry Jones RE described the boat bridge at Villa Velha when he passed in December 1812. The breadth of river was 140 paces (105m); distance of boat to boat (centre), ten paces (8m). It was made up of twelve large and two smaller boats, each having two anchors. To ensure there was no interruption in its availability, ten boats were kept in reserve. 1 He similarly described the bridge at Punhete that was made of short, stout pontoons. The length of the bridge was 160 yards (150m), made up of twenty-one pontoons. The distance from centre to centre of the boats was eight yards (8m). These pontoons only needed one anchor, as the river was less rapid. Each of these had a permanent engineering presence and a guard.
    As well as strategic crossing-points, bridging featured in operational campaigns. Moore’s retreat to Corunna in 1808/9 included the destruction of several bridges to delay the advance of the French. The destruction of the bridge at Castro Gonzalo (Benevente) led the repulse of the pursuing French cavalry and to a respite for the Allies. Several engineer officers were involved in destroying bridges and one, Lieutenant Davy, lost his life by misjudging his fuse. There was widespread concern in the Royal Engineers about the limited success in blowing-up bridges.
    Wellington’s first success in 1809 was when he ejected Marshal Soult from the Portuguese city of Oporto. The French had destroyed the bridge there and to pursue them required a boat bridge to be rapidly built to allow the bulk of the pursuing Allied troops to cross. This was done using the numerous local boats that were employed in the wine trade. The 1809 Talavera campaign relied on control of bridges further up the Tagus at Alcantara and Almaraz, and by the end of the year both of these bridges had been made impassable and the nearest intact crossing-point was at Arzobispo, which is much nearer to Madrid than Lisbon. The French constructed a boat bridge at Almaraz but this was not possible at Alcantara due to the steepness of the valley and the speed of the river. The Royal Staff Corps built an additional temporary bridge over the river Tietar for the passage of Wellington’s army. The river was about 150 feet (50m) wide, which contained a deep channel about 70 feet (20m) wide. There were no pontoons or boats available in the vicinity:
    The only material at hand was the timber from a large inn at about half a mile from the place … which was unroofed … a party of 500 men [taken from the line regiments] with saws and axes was sent to a distance of three miles to procure young pines to make [twenty] stakes. 2
    The main roof beams from the inn, 20 feet long and two feet square, were floated in the deep channel. Piles were then driven into the shallow part of the river using ‘large wooden mallets made on the spot’. The rafters and flooring from the inn provided enough decking to complete the bridge the whole held in place with ropes. This bridge was constructed in one day.
    Whilst the major campaigns of 1809 to 1811 focussed on access to the major strategic bridges over the Tagus, smaller bridges were also used and
Read Online Free Pdf

Similar Books

Firestorm

Mark Robson

Those Who Save Us

Jenna Blum

Feels Like Summertime

Tammy Falkner

Men of Intrgue A Trilogy

Doreen Owens Malek

What Came After

Sam Winston